PROJECTS

Each our project, large or small, is particularly important to us. We work on them very diligently and passionately because our name is behind all of them.

Here are some of the projects we have been working on in the past few years:

Boiler in steel plant in Slovakia:

  • Green field investment in the steel plant
  • Boiler to produce industrial electricity & gases
  • Length of the project: 2 years
  • Our company was direct subcontractor to the main EPC company for this project
  • On this project, we had:
    1. Argon (TIG – 141) welders
    2. Electric (111) welders
    3. Isometrics – preparing the material for the welders based on the drawing documentation
    4. Grinders – preparing the parts for the welders

Heating plant in eastern Slovakia:

  • Complete refurbishment of heating plant
  • Heating plant to produce green energy for heating
  • Length of the project: 1 year
  • Our company was direct subcontractor to the main EPC company for this project
  • On this project we had:
    1. Argon (TIG – 141) welders
    2. Isometrics – preparing the material for the welders based on the drawing documentation
    3. Grinders – preparing the parts for the welders

Gas pipeline in eastern Slovakia:

  • Complete change of the gas pipeline in the city in Slovakia
  • Disassembly and installation of the new gas pipeline
  • Length of the project: 7 months
  • Our company was direct subcontractor to the main investor for this project
  • On this project we had:
    1. Combination welders (141/111 – Argon/Electro)
    2. Isometrics – preparing the material for the welders based on the drawing documentation

Pipeline in chemical plant in Germany:

  • Complete change of the pipeline in chemical plant in Bavaria region in Germany
  • Disassembly and installation of the new pipeline
  • Length of the project: 3 months
  • Our company was direct subcontractor to the main EPC company for this project
  • On this project we had:
    1. Argon (TIG – 141) welders
    2. Isometrics – preparing the material for the welders based on the drawing documentation
    3. Grinders – disassembly the old pipeline & preparing the new pipes for the welders.

Paper plant in Slovakia:

  • Green field investment of the paper plant in Slovakia
  • Complete installation of the new pipeline across the new paper plant
  • Length of the project: 9 months
  • Our company was direct subcontractor of the main EPC company for this project
  • On this project we had:
    1. Argon (TIG – 141) welders
    2. Isometrics – preparing the material for the welders based on the drawing documentation